Federal buyers and automakers now face hard deadlines to keep restricted semiconductors and modules out of what they buy and sell. Yet the industry still answers "where did this part come from?" with a supplier's signature. When a re-marked chip passes electrical testing and a cloned module boots like the real one, paperwork is a statement of belief, not evidence.
Every one of these ends in a signature. None of them asks the part to prove anything itself.
The usual approach is a blocklist: find the bad parts and pull them. It loses because the bad part is built to look like a good one.
Stop asking "is this part banned?" and ask "can this part prove it is approved?" A part that cannot answer is not approved. No silicon identity, no approval.
A banned part does not need to be recognized. It simply cannot produce the proof.
The deadlines are fixed, and the parts going into those products are being designed and sourced now. Build the proof into the silicon today, and compliance becomes a check you run instead of a risk you sign for.
The FCC just closed the "component part loophole." Verifying where a device was assembled no longer proves it's clean: a logic-bearing part from a Covered List entity can hide inside an otherwise US-built device. Proving genuineness component by component is a harder, and more important, problem.
Read →The quantum clock is one threat across a vehicle's 20-year life. Parts swapped in service, over-the-air updates, new owners and AI model updates all lean on the same root of trust. Why a stored key is the wrong foundation for every one of them.
Read →We're talking with contractors, automakers and suppliers who want proof of approved origin per unit, not another supplier letter.